Commissioning works on the equipment of the equipment and hardware complex of automated process control systems include:

  • verification of the completed installation of systems in accordance with the requirements of SNiP 3.05.07-85 "Automation Systems", regulatory and technical documentation;
  • determination and installation of system parameters, coordination of the operating characteristics of instruments and automation, processing of logical and temporal relationships in accordance with the requirements of the project;
  • elimination of the causes of failure or "false" operation of elements and devices of the system;
  • determination of the compliance of the throughput capacity of shut-off and control valves with the requirements of the technological process, the correct position of the switches, determination of the flow characteristics of the regulating bodies and bringing them to the required form using the adjustment elements available in the instruction;
  • clarification of the static and dynamic characteristics of the object, the adjustment of the values ​​of the system settings parameters;
  • receiving from the customer and studying the work schedule of the process equipment, programs for the inclusion of the systems in the period of its comprehensive testing;
  • the inclusion of systems to ensure individual testing and comprehensive testing of process equipment;
  • determination of the suitability of the systems for operation and delivery to the customer, execution of acceptance documentation.

Commissioning works on automated control systems are carried out in several stages.

Preparatory work:

  • organizational and engineering work preparation;
  • acquaintance with technical documentation, production technology, main and auxiliary equipment;
  • development and coordination with the customer of the schedule and the commissioning program.

Adjustment work carried out before the individual tests:

  • verification of technical means of automation, including verification of the technical condition of devices and apparatus with bringing their parameters to the standards established by regulatory documents, with the replacement of defective ones with serviceable ones supplied by the customer;
  • preparation of measuring instruments for state calibration;
  • verification of the installation of technical means for compliance with the requirements of the 3rd part of the SNiP, the project and instructions of manufacturers.

Commissioning work carried out during the period of individual tests:

  • autonomous adjustment of systems;
  • adjustment of system settings in the process of individual testing of process equipment.

Adjustment work during the period of comprehensive testing of equipment:

  • complex adjustment of systems;
  • testing automated systems together with process equipment;
  • introduction in one copy of the project’s schematic diagrams of changes identified in the process of commissioning.

Additional services
Project management
Creating layouts
Quality control
Calculations, modeling
Recommendations and certificates

Technological design

You can order a container, a metal container with folding walls, a box container, metal boxes and a box for storing workpieces and parts, as well as their transportation and storage.

Despite the variety of standard metal containers, it is often necessary to design and manufacture containers and specialized containers that fully correspond to the characteristics of a particular enterprise. We carry out the production of packaging and non-standard packaging of metal of any types and sizes, including the size of your order.

Despite the variety of standard metal containers, it is often necessary to design and manufacture containers and specialized containers that fully correspond to the characteristics of a particular enterprise. We carry out the production of packaging and non-standard packaging of metal of any types and sizes, including the size of your order.

You can order a container, a metal container with folding walls, a box container, metal boxes and a box for storing workpieces and parts, as well as their transportation and storage.

Read more
Our projects
Stand for rivets
  • Проектирование (Catia V5R19
  • Производство механических узлов
  • Программирование PLC контроллера SIEMENS
  • Монтаж и пуско-наладочные работы
  • Подготовка документации по механике, электро- и пневмосхемы

Hemming bed transfer
  • Программирование PLC контроллера Siemens
  • Обновление электросхем в программе See Electrical
  • Обновление панели оператора

Stud welding stand
  • Проектирование механических узлов (Catia V5R19)
  • Производство механических узлов
  • Монтажные работы
  • 3D измерения 
  • Пуско-наладочные работы
  • Сдача документации по механике

Modification of the welding station Implementation of the project as a system integrator. Scope of work: unloading equipment, its unpacking, installation of equipment, commissioning and commissioning. The work was carried out
Modernization of the conveyor section
  • Проект демонтажа, расчеты на прочность
  • Демонтаж подвесной платформы 270м2, высота расположения 4м
  • Перемещение трансбордера
  • Программирование контроллеров SIEMENS и Schneider
  • Обновление документации

Modernisation of stud welding guide
  • Проектирование механических узлов (Catia V5R19)
  • Производство механических узлов
  • Пуско-наладочные работы
  • Сдача документации по механике, пневматике

Exhaust Prep Table
  • Проектирование механических узлов (Catia V5R19)
  • Производство механических узлов
  • Монтажные работы
  • Пуско-наладочные работы
  • Сдача документации по механике
Modernization of assembly line conveyor
  • Проектирование по механике
  • Производство механических узлов
  • Модификация электросхем
  • Программирование контроллеров ROCKWELL
  • Монтаж и наладка оборудования
  • Обновление документации

Engine subassembly table
  • Проектирование механических узлов (Catia V5R19)
  • Производство механических узлов
  • Монтажные работы
  • Пуско-наладочные работы
  • Сдача документации по механике
Silencer arc welding post
  • Проектирование механических узлов (Catia V5R19)
  • Производство механических узлов
  • Монтажные работы
  • Пуско-наладочные работы
  • Сдача документации по механике
Stud Welding Guide
  • Проектирование механических узлов (Catia V5R19)
  • Производство механических узлов
  • 3D-измерения
  • Монтажные работы
  • Пуско-наладочные работы
  • Сдача документации по механике
High precision clearance control gauge
  • Проектирование механических узлов (Catia V5R19)
  • Производство механических узлов
  • 3D-измерения
  • Монтажные работы
  • Пуско-наладочные работы
  • Сдача документации по механике
Turnkey installation of equipment
  • Разгрузка оборудования
  • Распаковка оборудования
  • Разметка пола
  • Механический монтаж
  • Электрический монтаж
  • Программирование контроллера SIEMENS
  • Монтаж и наладка оборудования

Stripping devices
  • Проектирование механических узлов (Catia V5R19)
  • Производство механических узлов
  • 3D-измерения
  • Пуско-наладочные работы
  • Сдача документации по механике